CW3E id: CLD
CDEC id: CDC
NWS id: CDXC1
Lat/Long: 39.243800 / -123.121500
Elevation: 259m
Team Lead: John Deane
Install Date: Sept. 20, 2017
Permit Expires: Aug. 1, 2027
Watershed: Russian
Telemetry: Cell
Monument: Pole
Land Owners: CalTrans
Permit Type: Caltrans
Site Type: Stream
CDEC id: CDC
NWS id: CDXC1
Lat/Long: 39.243800 / -123.121500
Elevation: 259m
Team Lead: John Deane
Install Date: Sept. 20, 2017
Permit Expires: Aug. 1, 2027
Watershed: Russian
Telemetry: Cell
Monument: Pole
Land Owners: CalTrans
Permit Type: Caltrans
Site Type: Stream
Cold Creek is the largest tributary of the EF Russian River, and appears to have only minor agricultural diversions. CW3E has obtained an encroachment permit from Caltrans for access and installation of the stream gauge and Isco sampler. Our encroachment permit allows us to access the site by notifying Caltrans personnel. The current encroachment permit expires August, 1st 2027.
Maximum Wadeable Level: 2.8 ft on pressure transducer doable on 3/6/2024. Velocities around 1.5 ft/s in thalweg. Doable, but wouldn’t want to go any higher.
Tasks
Due | Owner | Created By | Details |
---|---|---|---|
-- | Sarah Burnett | Sarah Burnett | Find old trail cam info and add here. |
Sensors
Type | Label | Model | SN | Installed On |
---|---|---|---|---|
Pressure transducer | -- | ONSET MX2001-04-SS-S | 21755829 | Oct. 10, 2023 |
Trail Camera | -- | Spypoint Flex-S | 2J321I0905 | June 26, 2024 |
Other Equipment
Type | Label | Model | SN | Installed On |
---|---|---|---|---|
Data Logger | None | HOBO RX2100 Station - CELL-4G | 21798326 | Oct. 9, 2023 |
Staff gage | None | ----------- | None | Sept. 20, 2017 |
Visits
On | Summary |
---|---|
Feb. 5, 2025 | High water check |
Dec. 16, 2024 | Manual Discharge Measurement |
Dec. 4, 2024 | Cleaned Trail Cam |
June 26, 2024 | Data Downloads / Maintenance / Manual Discharge Measurement / Trail Cam Replaced |
March 6, 2024 | Manual Discharge Measurement |
March 5, 2024 | Manual Discharge Measurement / Data Download / Maintenance |
Oct. 10, 2023 | Data Downloads / Installed HOBOlink Telemetry / Installed Trail Camera / ADCP measurement / Maintenance |
April 20, 2023 | Manual Discharge Measurement / Data Download |
June 1, 2022 | Data Download / Manual Discharge Measurement |
Jan. 26, 2022 | Data Downloads / Maintenance / Manual Discharge Measurement / Installed Barologger / Installed Trail Camera / Stream Survey |
Sept. 20, 2017 | Levelogger and staff plate installed |
Funding Sources
Start | End | Source |
---|---|---|
Sept. 20, 2017 | -- | USACE FIRO |