CW3E id: DAC
CDEC id: DAC
NWS id: --
Lat/Long: 38.789200 / -123.155803
Elevation: 157m
Team Lead: John Deane
Install Date: Sept. 25, 2024
Permit Expires: --
Watershed: Russian
Telemetry: Satellite
Monument: Pole
Land Owners: USACE
Permit Type: Email
Site Type: Stream
CDEC id: DAC
NWS id: --
Lat/Long: 38.789200 / -123.155803
Elevation: 157m
Team Lead: John Deane
Install Date: Sept. 25, 2024
Permit Expires: --
Watershed: Russian
Telemetry: Satellite
Monument: Pole
Land Owners: USACE
Permit Type: Email
Site Type: Stream
Site is located under a large bridge. The stilling well and staff gage are installed on the concrete support of the east side of the bridge. The datalogger and GOES setup are installed on a pole, next to the east end of the bridge on the upstream side. The trail camera is strapped to a tree on the opposite bank, on the upstream side of the bridge. The stream has lots of gravel and sand. Many tadpoles and small fish were spotted.
Tasks
Due | Owner | Created By | Details |
---|---|---|---|
-- | Sarah Burnett | Sarah Burnett | Add GPS antenna and logger S/Ns. Add photos/maps. Add funding source. |
-- | Sarah Burnett | Sarah Burnett | Figure out some sort of rope system to make it easier to access stream. |
Sensors
Type | Label | Model | SN | Installed On |
---|---|---|---|---|
Pressure transducer | -- | OTT PLS 500 | PS5-002878 | Sept. 24, 2024 |
Trail Camera | -- | Force-Pro-S | 2F304-11985 | Sept. 24, 2024 |
Other Equipment
Type | Label | Model | SN | Installed On |
---|---|---|---|---|
Solar Panel | None | OTT Solar Panel, 20 Watt unregulated | 002270202303010075 | Sept. 24, 2024 |
Solar Panel | Voltage Regulator | SUTRON Solar Panel Regulator, 3 amp | C2024 0034 | Sept. 24, 2024 |
Battery | None | Enersys Genesis NP24-12BFR | None | Sept. 24, 2024 |
GOES Satellite Telemetry | None | SUTRON SatLink 3 Lite Logger | None | Sept. 24, 2024 |
GPS Antenna | None | Trimble P/N 66800-52 | 071240204 | Sept. 24, 2024 |
Staff gage | None | WaterMark Style āCā Stream Gauge | None | Sept. 24, 2024 |
Visits
On | Summary |
---|---|
Feb. 7, 2025 | High water check |
Dec. 6, 2024 | Trail Cam Download |
Sept. 26, 2024 | Manual Discharge Measurement / Stream Survey |
Sept. 25, 2024 | Final touches on installation |
Sept. 24, 2024 | Site Installed |