Completed Telemetry Upgrade / Data Download / Installed Trail Cam

Details

Sarah Burnett / Adolfo Lopez-Miranda / Ava Cooper / Ali Wolman 9:30am PST

Staff plate reading 9:04am PST: 3.67ft

We finished securing the conduit to the wall. Used the hose clamps around the stilling well to secure the conduit to the t-stake, and pinned down the conduit with large rocks to the ground on the way to the wall. Cut some of the blackberry vines up to the datalogger on the tree.

The datalogger is facing north for accessibility, we hope to add solar panel on south side for better sunlight. Would be good in the future to move it inside Gary Yarborough's fence for protection, but we may need longer cable for that.

Downloaded barologger data and re-installed it next to datalogger.

Installed a trail cam (non-telemetered) on a pylon looking at the staff plate.