Summary
Trail Camera Download / Solinst Downloads / Manual Discharge Measurement / MaintenanceDetails
Sarah Ogle / Laney Wicker.
Level logger was about 4 minutes behind the computer. Stilling well completely clear (no sediment). Barologger (on fence by road) about 4 minutes behind computer. Synced time for both loggers. Staff plate buried in sediment at 10cm mark. Camera battery full; spider webs and poison oak around it; all photos through today downloaded. Manual discharge measurement taken a few feet downstream from level logger. At crossing downstream of site where we have done manual discharge measurements in the past, it was pooling and it looked like some rocks may have been placed in a way to make it pool there (tons of vegetation in channel just downstream of pool). Lots of poison oak! 0.383 cfs