Summary

Data Download / Manual Discharge Measurement / Maintenance / Turbidity Samples / Installed Telemetered Trail Cam / Installed Barologger

Details

Lindsey Jasperse / Garrett McGurk / Sarah Ogle 10:25UTC

Downloaded PT data via direct read cable. Cable still worked.

Completed discharge measurements.

Noted service (LTE) above stream by where truck was parked.

PT clock was offset by about 7 minutes reading 18:32. We started and stopped the data logger and synchoronized the time to the computer.

Changed units from m to cm.

Delay started the PT for 15 minute intervals starting at 18:45.

Sarah completed turbidity samples. Taken on right side downstream of gauge site.

-  1.26 NTU

-  1.24 NTU


Telemetered trail camera installed (Maybe 27 Jan 2022)

Barologger Installed