Lindsey Jasperse / Garrett McGurk / Sarah Ogle 10:25UTC
Downloaded PT data via direct read cable. Cable still worked.
Completed discharge measurements.
Noted service (LTE) above stream by where truck was parked.
PT clock was offset by about 7 minutes reading 18:32. We started and stopped the data logger and synchoronized the time to the computer.
Changed units from m to cm.
Delay started the PT for 15 minute intervals starting at 18:45.
Sarah completed turbidity samples. Taken on right side downstream of gauge site.
- 1.26 NTU
- 1.24 NTU
Telemetered trail camera installed (Maybe 27 Jan 2022)