CW3E id: PST
CDEC id: PST
NWS id: --
Lat/Long: 37.805600 / -120.268000
Elevation: 702m
Team Lead: Hart Wanetick
Install Date: Aug. 4, 2010
Permit Expires: --
Watershed: Tuolumne
Telemetry: Cell
Monument: Pole
Land Owners: Hetch Hetchy Water & Power
Permit Type: Handshake
Site Type: SurfaceMet+Soil

HCN Site 074

Site is on the north side of the reservoir in a flat open area. There is ongoing construction at Priest and as a result there are currently several office trailers adjacent to the site. The construction company has installed a fence around the site and keeps the vegetation inside the fence cut near ground level.


Site Photo:



Tasks

None

Sensors

TypeLabelModelSNInstalled On
Air Temperature/Relative Humidity--Sensiron SHT85N/A 74June 19, 2024
Anemometer--RM0510645771July 31, 2023
Barometer--Intersema MS5534CN/A 74Aug. 4, 2010
Pyranometer--LICOR LI-200RPY100384July 31, 2023
Soil Moisture10 cmDecagon 5TEN/A 74 0May 13, 2019
Soil Moisture30 cmDecagon 5TEN/A 74 1May 13, 2019
Soil Moisture60 cmDecagon 5TEN/A 74 2May 13, 2010
Soil Moisture90 cmDecagon 5TEN/A 74 3May 13, 2023
Tipping Bucket--Texas Electronics TE525USW 8 in. funnel40271-906July 31, 2023


Other Equipment

TypeLabelModelSNInstalled On
Data LoggerNoneDL4-GP0073June 19, 2024
Data LoggerNoneIO1-Met12July 30, 2012
Data LoggerNoneIO3-GPS/COMM84July 30, 2012
Solar PanelNone5WNoneAug. 4, 2010
BatteryNonePowerSonic PSH-1255F2NoneJune 19, 2024
Power SupplyCharge ControllerSunSaver 6LNoneAug. 4, 2010
Cell ModemNoneSierra Wireless LX40NoneFeb. 13, 2024


Visits

OnSummary
June 19, 2024Maintenance


Funding Sources

None