| Type | Soil Moisture |
|---|---|
| Label | 100 cm |
| Model | Stevens Hydraprobe |
| Serial # | 287560 |
| Installed on | April 24, 2026 |
| Deactivated on | -- |
| Height (cm) | -100 |
| Distance (cm) | 300 |
| Notes | Soil pit is located 3 m N of tower. Sensors are installed in the E face of the pit. Pentagon grounding configuration with a radius of 250cm and ~300cm sides. The main ground rod next to the tower was used as one of the pentagon's vertices. |
Calibration History
| On | Notes |
|---|