WEBVTT

00:00:00,000 --> 00:00:06,440
The AR scale Plume Diagrams show the observed and forecasted integrated vapor transport or IVT,

00:00:06,440 --> 00:00:10,920
an AR scale for a given location over the previous and future seven days.

00:00:10,920 --> 00:00:16,400
A map on the left shows the forecasted AR scale at each location over the next seven days.

00:00:16,400 --> 00:00:24,080
The Plume diagram in the center represents the IVT and AR scale analysis over the previous seven days on the left side of the plot,

00:00:24,080 --> 00:00:30,360
and the forecasted IVT and AR scale for the next seven days on the right side of the plot for the chosen location.

00:00:30,360 --> 00:00:35,200
On the forecast side, individual ensemble members are represented by thin grey lines.

00:00:35,200 --> 00:00:39,280
The unperturbed control forecast is represented by a thick black line.

00:00:39,280 --> 00:00:46,080
The ensemble mean is shown by a thick green line, and plus or minus one standard deviation from the ensemble mean

00:00:46,080 --> 00:00:50,160
are shown with a red and blue line as well as grey shading.

00:00:50,400 --> 00:00:57,440
Colored shading represents the AR scale for the given time calculated by either the control forecast or the ensemble mean.

00:00:57,440 --> 00:01:07,920
At the top of the plot, each AR is given a unique letter representation in the AR intensity, duration, and time integrated IVT during the AR is shown.

00:01:07,920 --> 00:01:14,800
Each shaded AR is then shown on the right plot over the AR scale matrix using the letter representations.

00:01:14,880 --> 00:01:22,400
Any time periods where IVT reaches over 250, but duration and intensity thresholds do not meet the minimum AR scale requirements

00:01:22,400 --> 00:01:32,400
will be highlighted by grey shading in the Plume diagrams and represented by circles for observed times and X's for forecast times on the AR scale matrix.

00:01:32,400 --> 00:01:43,920
The user can select different locations, choose between the GES and ECMWF EPS models, and choose to calculate the AR scale using the control forecast or the ensemble mean.

