Summary
Site visit to troubleshoot LiDAR/Disdro system and CHZ FenceDetails
Personnel: Ava Cooper, Gabe Lewis, Douglas Alden (remote)
LiDAR/Disdro
- UPS was powered up.
- Surge Protector ( SPD2-150-2PG ) needs to be replaced. Indicator on Neutral line is red.
- Computer power was powered up but had locked up and did not respond to ssh request. Powered cycled computer. Remote access to system was available after power cycle.
- Confirm data was being collected from all sensors and being downloaded to skyriver.
- Spare parts for LiDAR/Disdro system (POE switch with mount, Computer power supply, ethernet cables) left at CSSL.
CHZ Fence
- Unplugged/replugged the purple grounding wire for thermistor #21 on the fence, so now all 32 thermistors are working correctly.