Summary

Station installation

Details

New circuit added to the station by Doug Croisette <doug@dc-ed.com> prior to installation.

Broke ground on 28 Aug 2024 and began installation.

Surface met sensors were installed on existing Rohn tower at site.

Disdrometer and MRR were installed in the fenced in area adjacent to the USACE snow pillow.

The enclosure and battery backup were installed in the fenced in area with the existing USACE enclosures.