Summary

General maintenance

Details

Need to figure out which piece of equipment the wire belongs too. Adolfo says it’s a ground cable. Ask managers how sensitive wires might be and priority schedule. See photos below.


We releveled the pyranometer.

Wiped snow off of the solar panel.

We taped a metal conduit piece that was hanging below the enclosure to make a seal with the wire it was protecting.

Need to come back to connect with the datalogger, we needed the RS232 cable to USB connection.


Recorded all serial numbers and heights of instruments.


See photos in Piwigo

Site Photos or Screenshots (Virtual Visit)

site_photos-20230504-165443.jpg

site_photos-20230504-165444.jpg