Summary
Data Download / Stream Survey / Installed Barologger / Installed Trail Cam / Turbidity SampleDetails
Lindsey Jasperse/Garrett McGurk/Sarah Ogle 1400
Direct read cable was not working. Used one that we brought.
Left existing (non functional) direct read cable because did not have a cap for the PT.
Downloaded data.
Datalogger time off by -04:00
Stopped logger, synchronized time to computer UTC, set future start to 15 min interval starting @ 23:00
Re installed PT in stilling well.
Installed BaroLogger along path above the stilling will
Completed stream survey
Installed trail camera upstream of stilling well to the south (right) on mossy steep edge on a small tree branch
Noted 1-2 bars LTE, and trail cam showed 90% service coverage
Sarah completed turbidity sample. Taken from second pool of water from the middle of that pool.
- 0.42 NTU
- 0.43 NTU