Summary
Enclosure Lowering/Master Program Upgrade/SP Lite 2 InstallDetails
Team: Jacob, Jeri
Details:
The purpose of this trip was to:
- lower the enclosures from high on the tower to approximately eye level
- rewire the logger and upgrade the logger to the master program
- replace the faulty CS320 with an SP Lite 2