Details

Next visit: Galling has started on at least two bolts on enclosure. Add silica bronze bolts with anti-seize. Bring 1/4-28 re-threading tap and bolts. Bring nut in case tapping is unsuccessful. Change desiccant. Download GPS data along with disdro, mrr, surfacemet, and disdro, UPS logs. Silicone disdro junction box. Seal off MRR dish for wasps. Change TB screen to heated TB screen. Re-wire for master program. Change location of pyranometer and solar panel?


Done?
Not Yet

Due On
--

Assigned To:
Ross Beaudette

Created By:
Ross Beaudette