Summary
Updates (Hart & Ross)Details
- Upgraded enclosure to include battery backup with new UPS (and UPS script)
- Added cover with solar fan to keep enclosure cool
- Added battery enclosure with stand and cover
- Fixed clock drift with new script from Douglas to have Septentrio continually sync the computer
- Forgot to check TB
- Note: opened tipping bucket junction box and found condensation, box gasket was no longer fully compressed. Interior was airdried and resealed with gasket fully compressed
- Disdrometer decided to quit about 26 hours after we left the site
- Full Trip debrief here (with more notes)
Notes:
- Installed 6awg copper stranded wire between lighting rod and ground connection on base of surface Met tripod