Relevant Sites
CW3E ID | Site Name | Team Lead | Watershed | Telemetry | Monument | Land Owners | Permit Type | Site Type | Installed On | Permit Expires On | Sensors |
---|---|---|---|---|---|---|---|---|---|---|---|
LEE | Lee Vining | Hart Wanetick | Mono Basin | Cell | Tower | USFS | SurfaceMet+Soil | Aug. 28, 2004 | -- | 8 sensor(s) | |
SMH | Smith Peak | Hart Wanetick | Merced | Cell | Pole | USFS | SurfaceMet+Soil | Aug. 5, 2010 | -- | 10 sensor(s) | |
SUM | Sore Thumb | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet+Soil | Dec. 6, 2006 | -- | 8 sensor(s) | |
OVH | Over The Hill | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet+Soil | Dec. 3, 2006 | -- | 7 sensor(s) | |
PCC | Piute Creek Overlook | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet | Dec. 4, 2006 | -- | 5 sensor(s) | |
GDP | Glider Port | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet+Soil | Dec. 4, 2006 | -- | 7 sensor(s) | |
BEE | Beer Can | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet+Soil | Dec. 5, 2006 | -- | 8 sensor(s) | |
VLV | Valley View | Hart Wanetick | Owens | Radio | Pole | USFS | SurfaceMet | Dec. 5, 2006 | -- | 7 sensor(s) | |
LBH | Lower Bath House - SFSU Sierra Nevada Field Campus | Ava Cooper | Yuba | Satellite | MetPole | USFS | USFS | DisdroMet | Oct. 21, 2020 | Dec. 31, 2025 | 7 sensor(s) |
CHZ | CW3E @ CSSL | -- | Yuba | Cell | USFS | Other | Feb. 14, 2024 | -- | 2 sensor(s) |